Gardez ANA Brigade Facilities 15 KV Overhead Power Distribution System
Contractor / Client : Framaco-IDA JV / USACE
Location : Gardez / Afghanistan
Start Date : 10.12.2004
Completion Date : 19.08.2005
Brief Description of Project : The project consists of 15 KV Overhead MV Distribution System installation from power plant to the buildings in ANA compound.
Electrical works include; erection of 170 ea poles, 134 ea polemounted transformers, 8 ea pad-mounted transformers, pulling
31.000 mt bare Al wire and installation of all required hardware such as cutouts, sect. switches, anchors, etc.